Banner New

Contract Signing For Purchasing Steel Structure Production Equipment

16/09/2022

, 16/09/2022

On September 16, 2022, Global Benjamin Steel Co., Ltd. (GB Steel) signed a contract with Weldcom Industrial Corporation to invest in the most advanced steel structure manufacturing line for the steel structure plant in Thanh Hoa, Long An Province.

CONTRACT SIGNING FOR PURCHASING STEEL STRUCTURE PRODUCTION EQUIPMENT          

This is a long-awaited project by GB Steel, which has considered multiple investment options and plans to penetrate the steel structure market in the region. The factory system is designed according to international standards, with a total area of 25,000m2, including 2 production lines for light steel structures and 1 production line for heavy steel structures.

After coming into operation, the factory achieved a capacity of 1,500 2000 tons / month and met the diverse requirements of customers on types of structures: factories, workshops, mid-high-rise buildings, power plants, steel plants, petrochemical plants, shopping malls, stadiums ...

GB Steel factory operates completely according to ISO 9001-2015 standards, invests in modern machinery and technology to optimize production costs to get the most competitive price and promises to bring customers and partners the best service.

Link: https://cafef.vn/thep-toan-cau-dau-tu-nha-may-ket-cau-thep-moi-20220922105955257.chn

 

"GB STEEL – Your trusted partner"