TAKAZONA Viet Nam Factory

  • View: 61
  • Description:

    TAKAZONA VIET NAM FACTORY - PHASE 3

    Location          : Tay Ninh, Viet Nam

    Service            : Fabrication & Erection Steel Structure.

    Steel Weight    : 5000 m2

DETAILS

The Takazona Vietnam Factory – Phase 3 project is located in Long Hau's Industrial Parks, Tay Ninh Province, covering a total area of 5,000 m²The project features an optimized structural design, enhancing both construction efficiency and space utilization. GB STEEL is responsible for the fabrication and erection of the steel structure, ensuring strict adherence to quality, safety, and project timeline.

Looking for a trusted partner to specializing in providing comprehensive and total solutions for your next project? GB STEEL offers end-to-end solutions for Pre-Engineered Buildings (PEBs) and Steel Structure - from design and fabrication to on-site erection - ensuring cost efficiency, precision, and professionalism at every scale.

  • Email: contact@gbsteel.vn
  • Hotline: +84 766 488 488 – +84 766 489 489
  • Website: https://gbsteel.vn